USE AND OCCUPANCY
A Use and Occupancy Permit is required for any sale or conveyance of property. This permit will require a physical inspection of your property, which should be completed 30 days prior to the scheduled settlement to provide time to address any noted problems. A priority of the inspection will include the condition of curb and sidewalks and/or the construction of curb and sidewalk along the frontage of your property if it is not present and the removal of any basement floor drain that is connected to the sanitary sewer system. Uand0 TECHNICAL SECTION.pdf USE AND OCCUPANCY INSPECTION REPORT 2017. Make sure when you are submitting the U&O application to include a request for Final Sewer (sewer certification) and Final Trash (trash certification). Certifications are to be completed on a separate sheet from the U&O application. Fees are $25.00 for sewer certification and $25.00 for trash certification. Please make sure they are all on separate checks.