Work Crews Getting Ready to Pour Concrete for New Souderton Pool

Written by nucitrus on . Posted in News Archives

DivingWellFrame
A view of the new diving well. Penn Builders is pictured in the
background excavating for the footings for the new bathhouse building.
LeisurePoolFraming
A view of the zero entry area which will lead to the children’s area filled
with water features including a palm tree, a fire hydrant, and a sunflower.
LesurePoolFraming2
A view of the intermediate area where the large tube
slide will be located as well as an underwater bench section.

The Souderton Pool is beginning to take shape! Crews are hard at work framing up forms so that the base concrete shell for the leisure pool can be installed during the week of November 8.

The Pool Fundraising Committee reminds the community that donations will be accepted throughout the project, and {rokbox text=|naming opportunities| size=|750 520|}images/stories/PDFs/NamingOpportunities.pdf{/rokbox} are still available for many of the pool’s amenities. There still remains a lot of site work to complete and funds are greatly appreciated to help us meet the goal of opening Memorial Day weekend of 2011.

To donate by credit card call the Souderton Borough office at 215-723-4371.

To donate by check download the donation form and mail it with your check payable to the Make Your Splash Pool Campaign, Souderton Borough Office, 31 W. Summit Street, Souderton, PA 18964.

All gifts of $5,000 or more are considered a major gift and will be acknowledged on the entrance dedication wall of the Souderton Community Pool. For additional information visit the Souderton Pool Fundraising Committee’s website.

nucitrus

This information box about the author only appears if the author has biographical information. Otherwise there is not author box shown. Follow YOOtheme on Twitter or read the blog.