Road Closed Sign On White Background Free Vector

Beginning on Monday, July 29, as part of the "309 Connector Project", Eastbound Cowpath Road will be closed for roadway reconstruction between Derstine Road & Beck Road.

The detour could last up to 96 days. The reconstruction will occur in two stages, with ONLY single-direction Westbound traffic (toward Franconia Twp) able to get through. Eastbound traffic (toward Hatfield Twp) will detour to use [Beck Road-Elroy Road-Derstine Road] to reconnect with Cowpath Road.

Recent Articles